Step-by-step quality inspection procedure for incoming materials or finished goods. Covers sampling, measurement, documentation, and disposition.
View Live ExampleLocate the batch or shipment to be inspected. Record the lot number, supplier or production line, date, and quantity. Verify the inspection is scheduled or triggered.
Select samples according to the sampling plan (e.g., AQL table). For incoming materials, pull from multiple cartons. For production, sample at defined intervals.
Examine samples for surface defects, color consistency, labeling accuracy, and packaging integrity. Compare against the approved reference sample or specification sheet.
Use calibrated tools (calipers, gauges, scales) to verify critical dimensions against the specification drawing. Record each measurement.
Test the product's function as defined in the test plan: fit check, electrical test, pressure test, or other criteria. Document pass/fail for each test.
Enter all inspection results into the quality log or QMS system. Include pass/fail status, measurements, photos of defects, and inspector name.
Based on results: Accept the lot (move to storage/shipping), Reject (quarantine and notify supplier/production), or Hold (escalate for review by quality manager).
Apply the appropriate status label to the lot: green (accepted), red (rejected), or yellow (on hold). Update the inventory system to reflect the disposition.
Record your own version on your phone. BoFlow generates the steps, screenshots, and a shareable link. Takes minutes.
Start Free